By: Guillen H.B. No. 302
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to procedural requirements for uranium mining area permits
  and associated production area authorizations.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Section 27.0513, Water Code, is amended to read
  as follows:
         Sec. 27.0513.  AREA PERMITS AND PRODUCTION AREAS FOR URANIUM
  MINING. (a) The commission may issue an area [a] permit pursuant
  to Section 27.011 that authorizes the construction and operation of
  two or more similar injection wells within a specified area for
  mining of uranium.
         (a-1)  An application for a new area permit issued pursuant
  to Section 27.011, a major amendment of such a permit, or a renewal
  of such a permit for mining of uranium is subject to the public
  notice requirements and opportunity for contested case hearing
  provided under Section 27.018. Not later than the 30th day after
  the date the commission determines the application for an area
  permit to be administratively complete, the commission shall mail
  notice of receipt of the application to:
               (1)  the owners of the surface of:
                     (A)  the tract of land on which the existing or
  proposed permitted area is or will be located; and
                     (B)  the tracts of land adjacent to the land
  described by Paragraph (A); and
               (2)  the owners of mineral rights underlying:
                     (A)  the tract of land on which the existing or
  proposed permitted area is or will be located;
                     (B)  the tracts of land adjacent to the land
  described by Paragraph (A); and
                     (C)  the territory of any groundwater
  conservation district established in the county in which the
  existing or proposed permitted area is or will be located.
         (a-2)  A new, amended, or renewed area permit must
  incorporate a table of pre-mining low and high values representing
  the range of groundwater quality within the permit boundary and
  area of review, or other values acceptable to the commission,as
  provided by commission rule, for each water quality parameter used
  to measure groundwater restoration in a commission-required
  restoration table. The initial values in the permit range table
  must be established from pre-mining baseline wells and all
  available wells within the area of review, including those in the
  existing or proposed permit boundary and any existing or proposed
  production areas. Wells used for that purpose are limited to those
  that have documented completion depths and screened intervals that
  correspond to a uranium production zone aquifer identified within
  the permit boundary.
         (b)  For an area [a] permit for mining of uranium issued on or
  after September 1, 2007, pursuant to Section 27.011, the term of the
  permit to authorize injection for recovery of uranium shall be 10
  years. [The holder of a permit for mining of uranium issued by the
  commission before September 1, 2007, pursuant to Section 27.011,
  must submit an application to the commission before September 1,
  2012, for renewal of the permit to authorize construction and
  operation of injection wells for mining of uranium.] Authority to
  construct or operate injection wells for recovery of uranium under
  a permit issued before September 1, 2007, pursuant to Section
  27.011, expires on September 1, 2012, if an application for renewal
  of the permit is not submitted to the commission before September 1,
  2012. Expiration of authority under this subsection does not
  relieve the permit holder from obligations under the permit or
  applicable rules, including obligations to restore groundwater and
  to plug and abandon wells in accordance with the requirements of the
  permit and applicable rules.
         (c)  The commission may issue a holder of an area [a] permit
  for mining of uranium issued pursuant to Section 27.011 a
  production area [for mining of uranium an] authorization that
  allows the permit holder to conduct mining and restoration
  activities in production zones within the boundary established in
  the area permit. A production area authorization is not subject to
  the notice and hearing requirements described by Subsection (a-1),
  and the authorization is limited to staff administrative review and
  approval, if the production area is compliant with the technical
  and restoration requirements established under Subsection (c-1).
         (c-1)  The commission [by rule] shall establish application
  requirements, technical requirements, including the methods for
  determining restoration table values, and procedural requirements
  for a production area authorized in the boundaries of an area permit
  [any authorization]. If a restoration table value for a proposed or
  amended authorized production area [authorization] exceeds the
  range listed in the area permit range table such that it falls above
  the upper limit of the range, the value within the area permit range
  table must be used or a major amendment to the area permit range
  table must be obtained, subject to an opportunity for a contested
  case hearing [or the hearing requirements of Chapter 2001,
  Government Code].
         (c-2) [(c-1)]  The commission shall prioritize the
  conservation of regional groundwater water supplies when reviewing
  an application to amend a restoration table [value].
         (d)  Notwithstanding Sections 5.551, 5.556, 27.011, and
  27.018, an application for a production area [an] authorization or
  an amendment to a production area [an] authorization that allows
  the [permit] holder of an area permit to conduct mining and
  restoration activities [in production areas] within the boundary
  established in the permit is an uncontested matter not subject to a
  contested case hearing or the hearing requirements of Chapter 2001,
  Government Code, if:
               (1)  the authorization is for a production area located
  within the boundary of the [a] permit that incorporates [, for each
  production area addressed in the application,] a range table of
  groundwater quality restoration values used to measure groundwater
  restoration by the commission;
               (2)  the authorization [application] includes[, for
  each production area addressed in the application,] groundwater
  quality restoration values falling at or below the upper limit of
  the range established in Subdivision (1); and
               (3)  the authorization is for a production area located
  within the boundary of the [a] permit that incorporates groundwater
  baseline characteristics of the wells as [for the application]
  required by commission rule[; and
               [(4)  not later than the 30th day after the date the
  commission determines the application to be administratively
  complete, the commission mails notice of receipt of the application
  to:
                     [(A)  the owners of the surface of:
                           [(i)  the tract of land on which the existing
  or proposed production area is or will be located; and
                           [(ii)  the tracts of land adjacent to the
  land described by Subparagraph (i);
                     [(B)  the owners of mineral rights underlying:
                           [(i)  the tract of land on which the existing
  or proposed production area is or will be located; and
                           [(ii)  the tracts of land adjacent to the
  land described by Subparagraph (i); and
                     [(C)  any groundwater conservation district
  established in the county in which the existing or proposed
  production area is or will be located].
         (e)  An amendment in the [The] range of restoration values in
  the range table used for Subsection (c-1) may [(d) must] be
  established from baseline wells and all available well sample data
  collected in the area permit boundary and within one-quarter mile
  of the boundary of the production zone or from other values proposed
  by the applicant and approved by the commission.
         SECTION 2.  The change in law made by this Act applies only
  to an application for an area permit or a production area
  authorization or an amendment to a permit or authorization that is
  submitted to the Texas Commission on Environmental Quality on or
  after the effective date of this Act. An application for an area
  permit or a production area authorization or an amendment to a
  permit or authorization that was submitted to the commission before
  the effective date of this Act is governed by the law in effect at
  the time the application or amendment was submitted, and the former
  law is continued in effect for that purpose.
         SECTION 3.  This Act takes effect September 1, 2027.