A BILL TO BE ENTITLED
|
|
|
AN ACT
|
|
|
relating to requirements and preferences for purchasing |
|
|
construction materials produced in the United States and this |
|
|
state. |
|
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
|
SECTION 1. Chapter 2252, Government Code, is amended by |
|
|
adding Subchapter H to read as follows: |
|
|
SUBCHAPTER H. REQUIREMENTS AND PREFERENCES FOR DOMESTIC |
|
|
CONSTRUCTION MATERIALS |
|
|
Sec. 2252.231. DEFINITIONS. In this subchapter: |
|
|
(1) "Construction materials" means, if permanently |
|
|
incorporated into a public infrastructure project, iron, steel, |
|
|
manufactured products, concrete, cement, aggregates, glass, |
|
|
lumber, drywall, copper, aluminum, asphalt, plastics, and |
|
|
fiber-optic cable. |
|
|
(2) "Political subdivision" includes a county, a |
|
|
municipality, a municipal utility district, a water control and |
|
|
improvement district, a special utility district, and other types |
|
|
of water districts. |
|
|
(3) "Procuring entity" means a: |
|
|
(A) state agency; or |
|
|
(B) political subdivision. |
|
|
(4) "Produced in the United States" means: |
|
|
(A) with respect to iron and steel, all |
|
|
manufacturing processes, from the initial melting stage through the |
|
|
application of coatings, occurred in the United States; |
|
|
(B) with respect to a manufactured product: |
|
|
(i) the product was manufactured in the |
|
|
United States; and |
|
|
(ii) the cost of the product's components |
|
|
that are mined, produced, or manufactured in the United States is |
|
|
greater than 55 percent of the total cost of all the product's |
|
|
components; and |
|
|
(C) with respect to a construction material other |
|
|
than iron, steel, or a manufactured product, all manufacturing |
|
|
processes for the material occurred in the United States. |
|
|
(5) "Public infrastructure project" means the |
|
|
construction, reconstruction, alteration, repair, maintenance, or |
|
|
improvement of any building, structure, or infrastructure by a |
|
|
procuring entity through a contract with another person. The term |
|
|
includes any: |
|
|
(A) road, highway, or bridge; |
|
|
(B) water, wastewater, or flood control |
|
|
facility; |
|
|
(C) public building or facility; |
|
|
(D) transit or rail facility, port, or airport; |
|
|
or |
|
|
(E) broadband, telecommunications, or utility |
|
|
infrastructure. |
|
|
(6) "State agency" has the meaning assigned by Section |
|
|
2151.002. |
|
|
Sec. 2252.232. DUTY TO REQUIRE PURCHASE OF CONSTRUCTION |
|
|
MATERIALS PRODUCED IN UNITED STATES. Except as provided by Section |
|
|
2252.235, for each public infrastructure project of a procuring |
|
|
entity with an estimated contract value of $1 million or more, the |
|
|
procuring entity shall require the bid documents provided to all |
|
|
bidders and the resulting contract to include a provision requiring |
|
|
any construction materials used in the project to be produced in the |
|
|
United States. |
|
|
Sec. 2252.233. POWER TO REQUIRE PURCHASE OF CONSTRUCTION |
|
|
MATERIALS PRODUCED IN UNITED STATES. For each public |
|
|
infrastructure project by a procuring entity with an estimated |
|
|
contract value of $1 million or less, the procuring entity may |
|
|
require the bid documents provided to all bidders and the resulting |
|
|
contract to include a provision requiring any construction |
|
|
materials used in the project to be produced in the United States. |
|
|
Sec. 2252.234. PREFERENCE FOR CONSTRUCTION MATERIALS |
|
|
PRODUCED IN TEXAS. (a) A state agency that as a procuring entity |
|
|
includes a contract provision under Section 2252.232 or 2252.233 |
|
|
shall also include a contract provision requiring the contractor to |
|
|
purchase products and materials in the manner provided by Section |
|
|
2155.444. |
|
|
(b) A political subdivision that as a procuring entity |
|
|
includes a contract provision under Section 2252.232 or 2252.233 |
|
|
may also include the contract provision described by Subsection |
|
|
(a). |
|
|
Sec. 2252.235. DETERMINATION FOR EXEMPTION BASED ON |
|
|
NONAVAILABILITY, DELAY, OR COST. (a) Section 2252.232 does not |
|
|
apply to a public infrastructure project of a procuring entity if |
|
|
the procuring entity determines in writing that: |
|
|
(1) the construction materials needed for the public |
|
|
infrastructure project and produced in the United States are not: |
|
|
(A) reasonably available in sufficient |
|
|
quantities; or |
|
|
(B) of satisfactory quality; or |
|
|
(2) compliance with Section 2252.232 would: |
|
|
(A) materially delay the project schedule; or |
|
|
(B) result in unreasonable cost increases. |
|
|
(b) A determination under this section is not subject to |
|
|
public disclosure under Chapter 552. A procuring entity shall |
|
|
retain the reasoning for a determination under this section and |
|
|
provide the information to the comptroller for inclusion in the |
|
|
report required by Section 2252.239. |
|
|
Sec. 2252.236. EXEMPTIONS FOR DISASTER-RELATED AND |
|
|
FEDERALLY FUNDED PURCHASES. This subchapter does not apply to a |
|
|
contract: |
|
|
(1) entered into in response to a state of disaster |
|
|
declared under Chapter 418; or |
|
|
(2) involving federal funds. |
|
|
Sec. 2252.237. CONFLICT WITH OTHER STATE LAWS. To the |
|
|
extent of any conflict between this subchapter and another law of |
|
|
this state, including Subchapter G, the more stringent law |
|
|
controls. |
|
|
Sec. 2252.238. RULES. The comptroller shall adopt rules to |
|
|
administer this subchapter, including rules for ensuring |
|
|
contractor compliance. |
|
|
Sec. 2252.239. REPORT. (a) On or before September 1 of |
|
|
each year, the comptroller shall collect information from procuring |
|
|
entities on the purchase of construction materials under a public |
|
|
infrastructure project contract, including: |
|
|
(1) the source of the purchases; and |
|
|
(2) for a contract exempted from this subchapter under |
|
|
Section 2252.235, the reasoning supporting the exemption. |
|
|
(b) On or before December 1 of each year, the comptroller |
|
|
shall submit a summary report of the information collected under |
|
|
Subsection (a) to the legislature. |
|
|
SECTION 2. Not later than December 1, 2027, the comptroller |
|
|
shall adopt rules necessary to implement Subchapter H, Chapter |
|
|
2252, Government Code, as added by this Act. |
|
|
SECTION 3. Subchapter H, Chapter 2252, Government Code, as |
|
|
added by this Act, applies only in relation to a contract for which |
|
|
the request for bids or proposals or other applicable expression of |
|
|
interest is made public on or after the effective date of this Act. |
|
|
SECTION 4. This Act takes effect September 1, 2027. |